Written for Operations, asset-management, reliability, safety and technology leaders at electric utilities, and the sponsors who have to fund a first case.
What's in this playbook
Utilities are not short of AI ideas. They are short of first cases that can travel: a named process, a signed baseline, an operator who is not only the original builder, a person who can stand behind a dispatch, a switching instruction, a filing or an official outage message, and a way to stop. This playbook is the single energy document behind the energy industry pages. It is complementary to the manufacturing industry playbook already in the Resource Library, where plant-floor predictive maintenance is in view. This playbook is the operational path for a utility, with grid and asset health in depth, on purpose. It is not a near-duplicate of that manufacturing document, not a survey, and not a certification that a system is safe to run on a grid.
It maps six families of work. Each family has an honest first case and a case that is too wide. A sense-predict-recommend assist that reads, and does not write, the historian the utility already runs — a score, the evidence it used, and a proposed work order or inspection for a named planner or operator to issue — is an honest first case in asset health, once what is already running is on an inventory. A model that automatically dispatches a crew, issues a switching instruction, or files a regulatory report is not. The same distinction is drawn for grid operations (a recommended reading, not an unsupervised switching instruction), regulatory reporting (a draft for a named officer, not a filing the model makes), customer and outage communications (a person on every official message), field work and vegetation planning, and an internal process already run: AI as a recommend layer first; an unsupervised grid agent is not a first case this playbook will recommend.
How the tests and the method are meant to be used
Fourteen design tests are applied to every case. The answers will differ. The standard does not. A missing reliability or safety answer, an undefined "review," or an operator who is only the original builder, is a reason to pause, not permission to proceed. The reliability and safety functions, and counsel, decide what a reliability, safety, environmental, reporting or industrial-cybersecurity framework, if one applies, requires, and when. This playbook will not make those determinations, will not certify that a system is safe to run on a grid, will not certify alignment with a named framework, and will not claim a certified connector to a named energy vendor. Hosting is decided before a case is funded. Operational data may not be able to leave. Where they cannot, AsymiLink AI runs on your own hardware, with an optional air gap. Built to SOC 2 standards is the exact wording we use; it is not a safety certification.
The illustrative organization is a hypothetical regional electric utility, labeled as such and introduced in this playbook: overall 19, Developing, with a working historian and SCADA environment, Governance and talent among the constraints, and a next-step target of 24, still Developing — a next step, not a timeline, and not a promise. Its honest first work is to inventory what is already running, then, if the tests pass, a historian-read-only asset-health assist — not an unsupervised dispatch, not a switching instruction, and not an automatic filing. The financial method is The Complete Guide to AI Automation ROI. This playbook will not invent an energy-sector result. The 3.8x average first-year ROI across client engagements is an average, not a forecast or a commitment for any individual project. ROI is measured across client engagements against a baseline agreed before work starts. It is an average, not a forecast for any energy project.
Six families of work
each with an honest first case, a case that is too wide, and a defined gate. Each item below is the shape of the map; the full wording, honest first cases and “too wide” warnings are in the PDF.
F1
Asset health and predictive maintenance
F2
Grid operations and switching support
F3
Regulatory reporting and evidence
F4
Customer and outage communications
F5
Field work, vegetation and inspection planning
F6
Internal process and a proved pattern
The PDF gives, for each family, an honest first case, a case that is too wide, and a defined gate. The summaries above are the shape of the map, not a substitute for that wording.
Fourteen design tests (excerpt)
Fourteen design tests are applied to every case. The answers will differ. The standard does not. The full wording is in the PDF and the companion workbook.
T1–early
inventory and a named OT and IT boundary; proportionate consequence; a person on any dispatch, switching instruction, filing or official customer message, with review defined; the reliability and safety functions and counsel asked in time; a named source of truth, explanations and a frozen evaluation set.
Mid-tests
hosting decided up front, including where operational data cannot leave; a write to a work-management, SCADA, EMS or protection system as a different design from a read; an audit trail that can reconstruct a day; a named operator and a switch-off; training and reuse written down.
Later tests
anything that could put a person or the public in harm's way designed with the safety and reliability functions, or refused; honest notice to the people who work with the system; a bounded first case that raises the path; a signed baseline on the ROI method, and monitoring after launch that the organization that owns the system writes down.
A completed test sheet is not a certificate, not a compliance score, and not a finding that a system is safe or aligned with a named regime.
Get the guide and workbook
Enter your name, work email and company. The files appear on this page immediately. A backup download link is also emailed when email delivery is available.